Skip to main content
Morgan logo+Innovative Well Abandonment logo
Project AreaTechnologyRatesAssumptionsContacts

IMPERIAL OIL (IOL) PROJECT

MORGAN CONSTRUCTION & ENVIRONMENTAL INC.PILE CUTTING PROPOSAL

A field-ready plan using Innovative Well Abandonment’s high-pressure water jet cutting system with dual pumping systems.

View Rate ScheduleContacts

Compliant

SafetySync
COR Workplace Safety
ISNetworld Member Contractor
ComplyWorks
Avetta
WorkSafeBC
WorkHub
8AM

01 — Project Area

IMPERIAL OIL COLD LAKE

Morgan Construction and Environmental Ltd. — Imperial Oil project northwest of Cold Lake, Alberta

PILE CUTTING

NORTHWEST OF COLD LAKE

Project area northwest of Cold Lake. The scope covers approximately 4 km of above-ground pipeline supported by 6-inch, 8-inch and 10-inch piles spaced approximately 10 m apart. Morgan shears the pipes and I-beams, trimming I-beams to approximately 1 ft above ground; Innovative Well Abandonment cuts piles to approximately 1 ft above surface, then water jet cuts them 2 m below surface. Backfilling uses client-supplied material.

Applications

  1. 01

    Pipelines

  2. 02

    Gas plants and oil sands sites

  3. 03

    Production facilities

  4. 04

    Tank farms

  5. 05

    Well sites

02 — Technology

Cutting Technology & Execution

High-pressure water jet cutting, and the sequence the crews follow on each pile.

High-Pressure Water Jet Cutting

A high-pressure water jet cutting system with dual pumping systems cuts through pile walls without heat or sparks.

Minimal Ground Disturbance

Cuts are made from inside the pile, with minimal to no disturbance to the surrounding ground.

2 m Specified Depth

Piles on this project will be cut 2 metres below surface. The system can reach 10 metres or more.

External Cutting Tools

External cutting tools are available as an additional capability where internal access is limited.

Execution Sequence

  1. 01

    Morgan shears the pipes and I-beams, trimming I-beams to approximately 1 foot above ground.

  2. 02

    IWA cuts piles to approximately 1 foot above surface, then water jet cuts them 2 metres below surface.

  3. 03

    Internal debris is checked and cleared, with steaming if required.

  4. 04

    IWA completes a 360-degree water jet cut 2 metres below surface.

  5. 05

    Morgan pulls the piles with a tracked excavator.

  6. 06

    IWA backfills the holes with a backhoe using client-supplied material.

03 — Rates

Pricing & Rate Options

Two mutually exclusive pricing options. The client selects one option in advance of mobilization.

Option A — Per Pile

Per Pile Cut

$0$200

per 6-inch pile cut

Est. 8 piles/hour

$0$275

per 8-inch pile cut

Est. 6 piles/hour

$0$300

per 10-inch pile cut

Est. 5 piles/hour

Option B — Day Rate

Productive Field Day

$0$12,000

Per 10-hour productive field day. Unlimited cutting during those hours; travel and subsistence extra.

Choose one option in advance — options are mutually exclusive

Supporting Rates

  • Cut truck and crew mobilization / demobilization

    $0.00$375.00per hour

  • Cut truck and crew daily travel

    $0.00$375.00per hour

  • Support truck mobilization and in-field travel

    $0.00$2.00per km

  • Subsistence

    $0 if camp is provided.

    $0.00$275.00per person / day

  • Standby outside IWA’s control

    $0.00$450.00per hour

  • Case 590 backhoe with operator

    $0.00$160.00per hour

  • General labour

    $0.00$70.00per hour

  • Optional charge - centralizer and cap

    $0.00$85.00each

04 — Assumptions

Assumptions & Conditions

The basis of estimate for this proposal, including access, schedule and operating conditions.

Backfill Material

Backfilling uses client-supplied material (sand or other suitable fill). IWA will backfill every hole using a Case 590 backhoe.

Pile Removal

Morgan will provide the tracked excavator and pull each pile once IWA completes the cut.

Pipeline Removal

Morgan will shear the pipes and I-beams, trimming I-beams to approximately 1 foot above ground. IWA then performs all pile cutting.

Pile Interiors

Steaming may be required to clear debris from pile interiors before the internal cut can be completed.

Cut Depth

Piles will be cut 2 metres below surface with a 360-degree high-pressure water jet cut.

Pricing Option

The client will select either per-pile pricing (Option A) or the day rate (Option B) before mobilization.

Accommodation

Subsistence is charged at $275 per person per day, or $0 where camp accommodation is provided.

Site Access and Safety

The client will provide site access along the right-of-way, site orientation, and any required gas-detection and communication devices.

05 — Contacts

Contacts & Next Steps

Leads on both sides of the project, and what has to close before the crew mobilizes.

Client

Morgan Construction and Environmental Ltd. logo

Morgan Construction and Environmental Ltd.

Address

Calgary Project OfficeSuite 200, 809 Manning Road N.E,Calgary, AB T2E 7M9
DD

Dwayne Dale

Calgary Project Office | Morgan Construction and Environmental Ltd.

Mobile:403-678-1169ddale@mcel.ca

Contractor

Innovative Well Abandonment logo

Innovative Well Abandonment

Address

11630 Kingsway NW,Edmonton, AB T5G 0X5
Scott Bowes portrait

Scott Bowes

President — Primary Contact

780-808-1349sbowes@innovativewa.com
Chris Hamilton portrait

Chris Hamilton

Business Development Manager

403-630-1243chamilton@innovativewa.com
Next Step — Dwayne Dale

REVIEW | APPROVE | MOBILIZE

01

Assessment

02

Approval

03

Mobilize

Chat with us!